Verify utility, rate plan, and incentive eligibility
Add your ZIP first, then check official incentive and utility pages before changing the project scope.
Open incentive pagesHome profile
Recommended route
Add your ZIP first, then check official incentive and utility pages before changing the project scope.
Open incentive pagesList essentials for the first outage day, then estimate runtime and inverter size before comparing batteries, generators, or portable stations.
Calculate battery runtimeSolar economics depend on rate structure, roof readiness, export rules, and the incentive stack.
Run solar paybackUse budget, outage frequency, fuel access, maintenance, noise, and whole-home needs to decide the resilient backup path.
Compare backup pathsUse the same ZIP, bill, outage assumptions, saved calculator results, roof notes, and incentive links so bids are easier to compare.
Open calculatorsQuote packet readiness
Convert saved calculator results into a quote packet with the official links, assumptions, and scope questions each contractor should price.
Run and save the calculator results that match the project goals before requesting bids.
Attach saved battery runtime, EV charger cost, solar payback, or backup comparison outputs.Paste DSIRE, AFDC, IRS, ENERGY STAR, state, city, or utility program links into notes with the date checked.
Keep incentive links separate from contractor sales claims.Write one shared scope covering ZIP, bill, outage duration, panel photos, roof notes, utility rules, and saved results.
Use one scope to compare bids on equipment, labor, permits, and assumptions.Run a calculator and its latest result will appear here automatically.
Open calculators